Back to buildingFeb 8, 2026Sep 17, 2025Sep 17, 2025Sep 17, 2025Sep 17, 2025
639 EASTERN PARKWAY— Violations & Issues
Loading chart data...
Top Violations
Flooring1
Top 311 Complaints
Noise - Residential32
HEAT/HOT WATER25
Illegal Parking17
General Construction/Plumbing9
PLUMBING8
Class A - Non-HazardousCIV14 MAILED
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 1A
Class B - HazardousVIOLATION DISMISSED
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAIL BOX AT SOUTH WALL FOR APARTMENT 4E AT PUBLIC HALL, 1st STORY
Class B - HazardousVIOLATION DISMISSED
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAIL BOX AT SOUTH WALL FOR APARTMENT 4B AT PUBLIC HALL, 1st STORY
Class B - HazardousVIOLATION DISMISSED
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAIL BOX AT SOUTH WALL FOR APARTMENT 1D AT PUBLIC HALL, 1st STORY
Class B - HazardousVIOLATION DISMISSED
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MAIL BOX AT SOUTH WALL FOR APARTMENT 3C AT PUBLIC HALL, 1st STORY