7 total
Modification to existing Verizon site. Replace 4 antennas and 4 RRH units, relocate 2 GPS units, install 2 new antennas, and install new platform with related equipment on roof. Additionally installing 2 new dish antennas.
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
FACADE REPAIR AS PER PLANS FILED HEREWITH. FACE BRICK REPLACEMENT, REPOINTING, CAULK JOINTS AT A/C SLEEVE AND WINDOW FRAMES, CONCRETE CRACKS/SPALLS REPAIR AT BALCONIES, SCRAPE, PRIME AND PAINT LINTELS, LINTEL REPAIR AT ROOF BULKHEAD.
DISH WIRELESS- Installation of 3 new antenna sectors with 6RRH units and 1 GPS unit on roof. Install 1 new equipment cabinet on steel platform on roof.. Service connection in Cellar to roof. All in conformance with TPPN 5/98.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
DECOMMISSION OF EXISTING NYCWIN TELECOM SITE. REMOVE ALL ANTENNAS AND EQUIPMENT FROM THE ROOF. ORIGINAL INSTALLATION APPROVED UNDER APPLICATION # 310031257
Installation of NYC DEP antenna site. Install 2 (DCU) new antennas, one DCU equipment cabinet and related solar panel mounted to bulkhead on roof. No change in use, egress or occupancy.