Back to building

536 73 STREET— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster3
Pest Infestation2
Smoke/CO Detector1
Water Leak1
Roof/Ceiling1
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Class B - HazardousNOV SENT OUT

§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Class B - HazardousNOV SENT OUT

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Class B - HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Class B - HazardousNOTICE OF ISSUANCE SENT TO TENANT

§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Class B - HazardousNOV SENT OUT

HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Class B - HazardousNOV SENT OUT

HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Class A - Non-HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1

Oct 21, 2025
Advertisement