529 EAST 85 STREET— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AT NORTH STAIRS AT PUBLIC HALL
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 6D
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE AIR VALVE TO METAL RISER AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 6D
§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 6D
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 6D
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 6D
§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH/BASIN TO WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 6D
§ 27-2005 ADM CODE REFIT DOOR AT REFUSE CLOSET AT PUBLIC HALL, 6th STORY
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 6D