520 EAST 5 STREET— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2005 HMC: REFIT THE LOWER SASH WINDOW AT 2ND WINDOW FROM EAST AT SOUTH. IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 3B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT WEST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT A, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: A
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT A, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
Apt: A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 5 SQ FT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: B
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.