19 total
Install a new air conditioning system in Apartment 23P, including (1) outdoor condensing unit, (4) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans. No change in use, egress, or occupancy.
REPLACE (3) DOMESTIC HOT WATER HEATER EXCHANGERS WITH (2) DOMESTIC HOT WATER HEAT EXCHANGERS IN BUILDING NO. 3.
REPLACEMENT OF EXISTING WALL A/C UNITS WITH NEW DUCTLESS AIR CONDITIONING SYSTEMS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
Install new air conditioning system in Apartment 19C, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved plans. No change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection
Installation of Air Conditioning system in apartment 18G as per plans. Including refrigerant piping, drainage, and control system. No change in use, egress, or occupancy
Removal of existing system & installation of new heating and cooling split system in apartment 17H
Removal & replacement of exhaust fans along the main roof in conjunction with roofing replacement program. No change in use, egress, or occupancy .
IN BUILDING NO. 3 REMOVAL OF EXISTING COGEN SYSTEM TO INCLUDE GAS PIPING CAP AND REMOVAL FOR 1 EXISTING CO GEN UNITS.
Roofing Replacement Program not including replacement of the entire underlying roof deck or roof assembly. No change to use, egress or occupancy.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of Air Conditioning system in apartment 10R as per plans. Including refrigerant piping, drainage, and control system. No change in use, egress, or occupancy
Installation of Air Conditioning system in apartment 17R as per plans. Including refrigerant piping, drainage, and control system. No change in use, egress, or occupancy
REPLACEMENT OF SEPARATE EXISTING WALL A/C UNITS WITH NEW DUCTLES AIR CONDITIONING SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Installation of Air Conditioning system in apartment 13J as per plans. Including refrigerant piping, drainage, and control system. No change in use, egress, or occupancy
NEW DUCTLESS AIR CONDITION SYSTEM FOR APARTMENT 16C. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
NEW DUCTLESS AIR CONDITION SYSTEM FOR APARTMENT 17D. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Installation of Air Conditioning system in apartment 11C as per plans. Including refrigerant piping, drainage, and control system. No change in use, egress, or occupancy
NEW DUCTLESS AIR CONDITIONING SYSTEM FOR APARTMENT 10F. NO CHANGE IN USE OCCUPANCY OR EGRESS