8 total
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION, ALL WORK TO COMPLY WITH CHAPTER 33 OF NYCBC.
Rebuild parapet and bulkhead as per plan. No change in use, egress, or occupancy.
Modification to existing VERIZON site. Relocate/replace 4 antennas, replace 2 antennas, install 2 equipment cabinets on new platform, replace 6 RRH units and install 3 RRH units on the roof.
Installation of suspended scaffold for facade inspection/repair.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Interior renovation as shown on plans filed herewith.
Install new VERIZON site. Install 3 sectors (9 antennas), install 9 RRH units, install 2 GPS units, and 1 equipment cabinet on new platform on the roof. All in conformance with TPPN 5/98. No change in use, egress, or occupancy.