Brooklyn · February 2026
Best & worst months to sign a lease
Potential savings: ~13% by timing your move to August.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
No HPD records on file in the last 7 years.
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 5 by score · of 1995 total
ACRIS deeds and regulatory filings
V-DOB VIOLATION - ACTIVE — OBSERVED TEMPORARY SHORING SYSTEM CONSTRUCTED AT THE SUB-BASEMENT LEVEL WITH APPRX FIFTEEN PIECES OF (FROM
V-DOB VIOLATION - ACTIVE — VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
V-DOB VIOLATION - ACTIVE — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
V-DOB VIOLATION - ACTIVE — PARTIAL VACATE ORDER. OBSERVED AT TIME OF INSPECTION EXP 4(WALKWAY) DEFECTIVE STUCCO BY 3FL UP TO PARAPET. R
V-DOB VIOLATION - ACTIVE — EMERGENCY WORK ORDER DUE TO UNSTABLE FACADE AND PARAPET WALLS LOCATED AT EXP 4. REMEDY: IMED PROVIDE S
V-DOB VIOLATION - ACTIVE — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
V*-DOB VIOLATION - DISMISSED — INSTALL APPROX. 122 LINEAR FEET OF SIDEWALK SHED ALONG SEDGWICK AVENUE & APPROX. 74 LINEAR FEET SIDEWALK SHED
V-DOB VIOLATION - ACTIVE — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
V*-DOB VIOLATION - DISMISSED — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4