382 RALPH AVENUE
Similar buildings nearby.
Embed this building’s record
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Drop this scorecard into a tenant guide, blog post, or wiki. It updates itself as new violations are filed.
Brooklyn · February 2026
Best & worst months to sign a lease
Potential savings: ~9% by timing your move to February.
Monthly counts over the last 7 years · all data sources
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 1 by score · of 3 total
ACRIS deeds and regulatory filings
The eastern stretch of Bed-Stuy along Fulton Street has a grittier, more authentic energy than the polished western blocks. Stuyvesant Avenue's brownstones are among the finest in the borough, and the neighborhood's deep-rooted Black community supports a growing local business scene.
HPD Class B Violation — § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1s
HPD Class A Violation — § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST AND SOUTH WALL IN THE 1
HPD Class B Violation — § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MON
HPD Class B Violation — § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FR
HPD Class B Violation — § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE KI
HPD Class B Violation — § 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRING AT CE
UNSANITARY CONDITION — PESTS
PAINT/PLASTER — WALL
UNSANITARY CONDITION — MOLD
UNSANITARY CONDITION — PESTS