Back to building

28 3 PLACE— Violations & Issues

Loading chart data...

Top Violations

Heat/Hot Water3
Water Leak1
Paint/Plaster1
Roof/Ceiling1

Top 311 Complaints

PLUMBING9
HEAT/HOT WATER6
DOOR/WINDOW3
APPLIANCE2
UNSANITARY CONDITION2
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2026 ADMIN. CODE: REPLACE THE BROKEN OR DEFECTIVE WASHBASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 3, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 3

Jan 28, 2026
Class B - HazardousVIOLATION CLOSED

§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING, EAST WALL IN THE 1st PRIVATE HALLWAY LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 3

Jan 27, 2026
Class B - HazardousVIOLATION CLOSED

§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING, EAST WALL IN THE 1st PRIVATE HALLWAY LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 3

Jan 27, 2026
Class B - HazardousVIOLATION CLOSED

§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ... IN THE BATHROOM LOCATED AT APT 3TOPFL, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 3TOPFL

Jan 24, 2026
Class B - HazardousVIOLATION CLOSED

§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ... IN THE BATHROOM LOCATED AT APT 3 , 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 3

Jan 24, 2026
Class B - HazardousVIOLATION CLOSED

§ 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ... IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 3

Jan 24, 2026
Class B - HazardousVIOLATION CLOSED

§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3 , 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: 3

Jan 24, 2026
Advertisement