Back to building

242 KOSCIUSZKO STREET— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster2
Water Leak2
Flooring1

Top 311 Complaints

Noise - Residential5
Blocked Driveway4
UNSANITARY CONDITION3
WATER LEAK3
APPLIANCE2
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jan 11, 2025
Class B - HazardousINVALID CERTIFICATION

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th BATHROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jan 11, 2025
Class B - HazardousINVALID CERTIFICATION

§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT CERAMIC WALL TILES AT EAST WEST AND NORTH WALLS IN THE 4th BATHROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jan 11, 2025
Class B - HazardousINVALID CERTIFICATION

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 4th BATHROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jan 11, 2025
Class B - HazardousINVALID CERTIFICATION

§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB AT EAST IN THE 4th BATHROOM FROM NORTH LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jan 11, 2025
Advertisement