22 NORTH 6 STREET, Brooklyn, NY, 11249 · New York City · 27 total events
0 infested unit(s) reported
WALL
MOLD
BELL/BUZZER/INTERCOM
FLOOR
Application to convert public corridor space to dwelling unit space for Apt 15KL. No change to use, egress or occupancy.
Installation of glass railing along the plaza deck. No change to use, egress, or occupancy.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
Filing as per plans for the installation of two new barbeque grills located outside of building with related gas piping.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Installation of suspended scaffold for facade work or inspection
Limited Exterior Repairs. No change to use, egress, or occupancy.
SPRINKLER INSTALLATION FOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH
MINOR RENOVATION FOR APARTMENT #26C,NO CHANGE IN USE,EGRESS, OCCUPANCY AND BULK.
RENOVATION OF EXISTING APT. 21 C RENOVATION CONSISTS OF FLOORS AND NEW INTERIOR FINISHES AND FIXTURE WORK AS PER PLAN. NO CHANGE IN USE, EGRESS, & OCCUPANCY
FACADE INSPECTIONS ONLY
Filing for replacement of roof membrane on the 10th floor; no change to use, egress or occupancy
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 19C, 19th STORY, 4th APARTMENT FROM EAST AT SOUTH
Judgment: NO
DOOR
REFRIGERATOR
WINDOW FRAME
MOLD
PLUMBING WORK IN CONJUNCTION WITH ALTERATION 340730604
Remove section of existing 6 CMU wall, install new steel beam lintel, build new 6 CMU wall on top of the lintel, install new fire rated double door, fireproof lintel. ( No change to use, egress for or occupancy)