Brooklyn · March 2026
Best & worst months to sign a lease
Potential savings: ~7% by timing your move to March.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING METAL HANDRAIL AT NORTH AND SOUTH, STOOP AT BUILDING FRONT
§ 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING CONSISTING OF KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT STORM DOOR AT BUILDING FRONT
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileACRIS deeds and regulatory filings
HPD Class B Violation — § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING METAL HANDRAIL AT NORTH AND SOUTH, STOOP AT BUILDING FRONT
HPD Class C Violation — § 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING CONSISTING OF KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT STORM D
HEAT/HOT WATER — ENTIRE BUILDING