No published reviews yet. Be the first to tell future tenants what it's really like to live here.
182 GRAHAM AVENUE, Brooklyn, NY, 11206 is a 7-unit rental building in Williamsburg, NYC. See every violation, 311 complaint, tenant review, and the LucidIQ score — before you sign a lease.
Brooklyn · February 2026
Best & worst months to sign a lease
Potential savings: ~8% by timing your move to November.
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 1 by score · of 2 total
ACRIS deeds and regulatory filings
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
No published reviews yet. Be the first to tell future tenants what it's really like to live here.
Monthly counts over the last 7 years · all data sources
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3A, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
HPD Class A Violation — § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING I
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st
HPD Class B Violation — § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MON
HPD Class B Violation — § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE BATHROOM LOCATED AT APT 3A, 4th STOR
HPD Class B Violation — § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEV
PAINT/PLASTER — CEILING
ELECTRIC — WIRING
PLUMBING — BASIN/SINK
PAINT/PLASTER — WALL
South Williamsburg is a neighborhood of contrasts — the Hasidic Jewish community's established blocks sit alongside newly arrived artists and young professionals. Broadway cuts through with discount shops and Dominican restaurants, while side streets reveal hidden cafes and galleries.