1811 66 STREET— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2
§ 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2
§ 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2
§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID REGISTRATION STATEMENT IS FILED.
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). THAT IS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 2
§ 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE AND GROUTS JOINTS OF VISIBLE MOLD AT SOUTH AND WEST WALLS AROUND BATHTUB, IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 2
§ 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING MISSING COVER LIDS AT GARBAGE CANS,AT BUILDING FRONT ENTRANCE
§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF HOTWATER EXCEEDED MAXIMUM ALLOW TEMPERATURE OF 130.F DEGREES AT HOTWATER FIXTURES , IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Apt: 2
§ 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE BUILDING FRONT ENTRANCE