6 total
Kitchen & bathroom renovation in apt D2, fourth floor. Work to include fire stopping, new finishes, and refurbish existing wood floor. No change in use, egress nor, occupancy.
replacement of pluming fixtures in conjunction with the interior renovation of apt d2. no change in use, egress nor occupancy.
Filing for the installation of new sanitary roughing for the existing kitchen and bathroom in apt A9, first floor. No change in use, egress nor occupancy.
LEGALIZE RENOVATIONS IN APT A9, FIRST FLOOR. WORK TO INCLUDE NEW KITCHEN AND BATHROOM FINISHES, REPAIR/REPLACE FLOORS & CEILINGS. REPLACEMENT OF PLUMBING FIXTURES TO BE FILED SEPARATELY. NO CHANGE IN USE, EGRESS, NOR OCCUPANCY.
PLUMBING WORK ASSOCIATED WITH THE RENOVATIONS IN APT A9, 1ST FL. FILING TO ADDRESS ECB VIOLATION 35656104Y. NO CHANGE IN USE, EGRESS NOR OCCUPANCY.
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL