11 total
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES.
Structural work for repairs/reinforcing first floor framing. Repairs at rear and south existing fire escape at 4th floor level as needed.
Installation of plumbing fixtures along with related piping.
SCOPE OF WORK INCLUDES THE REPLACEMENT OF GAS BOILERS AND ASSOCIATED PIPING AND DUCTWORK.
Scope of work includes the repair and/or replacement of heating, and air condition systems of existing building, as per plans.
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. PIPE SCAFFOLDING SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of plumbing fixtures along with related piping.
MECHANICAL WORK INCLUDES INSTALLATION OF NEW GAS VENT DUCTS IN BOILER ROOM
Facade repairs. No change in egress, use or occupancy.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS, SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.