4 total
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
MODIFICATION TO AT&T SITE. INSTALL 3 ANTENNA AND RETROFIT 2 CABINETS.
MODIFICATION TO AT&T SITE.REPLACE (6) ANTENNAS, REPLACE (1) EQUIPMENT CABINET, AND INSTALL (3) RRH UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ALL IN CONFORMANCE WITH TPPN 5/98.
Replacement of existing telecommunications antennas with installation/replacement of RRH units on roof. Removal/installation of cabinets in the existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.