11 total
INSTALLATION OF 195' NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
WORK SHALL INCLUDE DIRECT REPLACEMENT OF FINISHES DIRECT REPLACEMENT OF APARTMENT KITCHEN, BATHROOMS, DOORS AND WINDOW SASHES. ADDITIONAL GROUND LEVEL HARDSCAPE REPAIRS AND IMPROVEMENTS AS NEEDED PER PLANS.
Installation of plumbing fixtures along with related piping.
Scope of work includes the repair and/or replacement of ventilation components and heating elements in bathroom/kitchen of existing apartments, as needed.
INSTALLING A BETA MAX HOIST IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
PAA filed to add suspended scaffold at front of the building in order to perform exterior facade repairs. Facade inspections to be performed. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
Suspended scaffold in order to perform exterior facade repairs. Facade inspections to be performed. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.
Facade repairs. No change in egress, use or occupancy.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM FACADE REPAIR. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE.
PAA filed to add suspended scaffold at front of the building in order to perform exterior facade repairs. Facade inspections to be performed. Sidewalk shed filed under separate application. No change in use, occupancy or egress under this application.