147 SHEFFIELD AVENUE— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Apt: 2A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 2A
§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2B
§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 2B