Back to building

1234 PROSPECT AVENUE— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster2
Water Leak1
Pest Infestation1
Lead Paint1

Top 311 Complaints

FLOORING/STAIRS5
Noise - Residential4
PLUMBING3
UNSANITARY CONDITION3
ELECTRIC3
Class B - HazardousVIOLATION DISMISSED

§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS ...AT BATH TUB IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jul 14, 2023
Class B - HazardousVIOLATION DISMISSED

§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ... BATH TUB WITH PORCELAN ENAMEL PAINT. IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jul 14, 2023
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ...ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 3

Jul 14, 2023
Class A - Non-HazardousVIOLATION DISMISSED

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

Mar 29, 2023
Class C - Immediately HazardousVIOLATION CLOSED

§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CEMMENT AT CEILING OF FRONT AREAWAY LEADING TO BASEMENT

Jul 12, 2021
Advertisement