Back to building

122 FENIMORE STREET— Violations & Issues

Loading chart data...

Top Violations

Pest Infestation4
Paint/Plaster3
Water Leak1

Top 311 Complaints

Illegal Fireworks17
Noise - Residential8
Noise - Street/Sidewalk6
PAINT/PLASTER3
PLUMBING3
Class A - Non-HazardousVIOLATION DISMISSED

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

May 4, 2026
Class A - Non-HazardousVIOLATION DISMISSED

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

Jun 9, 2025
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: A2

Apr 22, 2024
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE FOYER LOCATED AT APT A2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: A2

Apr 22, 2024
Class A - Non-HazardousVIOLATION DISMISSED

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

Apr 10, 2024
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT C3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: C3

Jan 14, 2024
Class A - Non-HazardousVIOLATION DISMISSED

(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.

Feb 24, 2022
Class B - HazardousVIOLATION DISMISSED

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT C2, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH

Apt: C2

Aug 30, 2019
Advertisement