Pros: NONE AT ALL Cons: Management is HORRIFIC. Steer clear of this building or any others they manage at all costs. The event space on the first floor is a nightmare and management has barely done a thing to address th…
1119 BROADWAY is a new-construction 2016 building, 6 floors, 11 units in Bushwick, NYC. Owned by ELEVEN21 LLC. Public records show 10 open violations, 12 311 complaints on file. Tenant-impact history includes 2 evictions. Rent stabilization on file covers 10 units (registered 2024). Lucid Rents has 2 verified tenant reviews on this building.
Brooklyn · February 2026
Best & worst months to sign a lease
Potential savings: ~6% by timing your move to February.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING SIGN AT PUBLIC HALL, 1st STORY
§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
Pros: NONE AT ALL Cons: Management is HORRIFIC. Steer clear of this building or any others they manage at all costs. The event space on the first floor is a nightmare and management has barely done a thing to address th…
Pros: Convenient, near subway station, near coffee shop, fairly new appliances Cons: Where should I start: * Management is not severe and does not really care about their tenants * The events space on the 1st floor is…
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 2 by score · of 3 total
ACRIS deeds and regulatory filings
HEAT/HOT WATER — APARTMENT ONLY
UNSANITARY CONDITION — MOLD
FLOORING/STAIRS — FLOOR
FLOORING/STAIRS — FLOOR
Eviction Executed — Apt 5A — Possession
PLUMBING — BATHTUB/SHOWER
FLOORING/STAIRS — FLOOR
HPD Class A Violation — § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGA
HPD Class A Violation — § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVA
HPD Class A Violation — § 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NE