Back to building

1119 BERGEN STREET— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster7
Pest Infestation3
Smoke/CO Detector2
Flooring1
Lead Paint1

Top 311 Complaints

Lead3
UNSANITARY CONDITION3
Request Large Bulky Item Collection3
Noise - Residential2
WATER LEAK1
Class B - HazardousNOV SENT OUT

§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class C - Immediately HazardousCERTIFICATION POSTPONMENT GRANTED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class A - Non-HazardousNOV SENT OUT

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class C - Immediately HazardousCERTIFICATION POSTPONMENT GRANTED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class A - Non-HazardousNOV SENT OUT

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class A - Non-HazardousNOV SENT OUT

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class C - Immediately HazardousCERTIFICATION POSTPONMENT GRANTED

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class B - HazardousNOV SENT OUT

§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
Class C - Immediately HazardousCERTIFICATION POSTPONMENT GRANTED

§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH

Apt: 1B

Jun 25, 2026
1–10 of 18
page 1 / 2
Advertisement