104 TAPSCOTT STREET is a prewar 1925 building, 32 units in Brownsville, NYC. Owned by NYC PACT PRESERVATION PARTNERS LLC. Public records show 43 open violations, 27 311 complaints on file.
Brooklyn · February 2026
Best & worst months to sign a lease
Potential savings: ~13% by timing your move to March.
Asking rent per bedroom type — switch tabs to see each with effective (concession-net) rent.
Monthly counts over the last 7 years · all data sources
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH 2ND FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4C , 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Portfolio-level grade reflects the landlord's buildings across NYC, weighted by unit count. Individual building grades may differ.
View full landlord profileTop 5 by score · of 135 total
ACRIS deeds and regulatory filings
Noise - Residential — Loud Talking
Noise - Residential — Loud Music/Party
Water System — Hydrant Running Full (WA4)
Water System — Hydrant Running (WC3)
Noise - Street/Sidewalk — Loud Music/Party
HEAT/HOT WATER — ENTIRE BUILDING
HPD Class B Violation — § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER WINDOW SASH 2ND FROM EAST AT S
HEAT/HOT WATER — ENTIRE BUILDING
HEAT/HOT WATER — ENTIRE BUILDING
General Construction/Plumbing — Wall/Retaining Wall - Bulging/Cracked