2 total
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
INSTALL TEMPORARY STEAM LINE ABOVE GROUND FROM 86-00 TO 84-00 REAR OF BUILDINGS WITH TEMPORARY INSULATION AND PROTECTION NETTING. NO CHNAGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.