5 total
Herewith filing for repairs to this existing 2-family building. No Change to use, occupancy or egress.
The Bronx River CSO-BXR-HP-011 site construction will include Sidewalk Restoration and Dumpster Relocation
Direct replacement of existing gas furnace unit to connect to existing ductwork. No change of use, egress or occupancy under this application.
DIRECT REPLACEMENT OF EXISTING GAS FURNACEUNIT TO CONNECT TOEXISTING DUCTWORK.
REPLACE EXISTING 3/4 PIPE AT 3RD FLOOR HOT WATER HEATER WITH NEW. GAS TEST ENTIRE RISER FROM METER AT OSP THRU 3RD FLOOR EQUIPMENT. EXISTING GAS METER SERVICES EXISTING FURNACE AND HOT WATER HEATER ON 003 AND EXISTING COOKING EQUIP ON 002.