Back to building

934 BARRETTO STREET— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster13
Water Leak8
Roof/Ceiling6
Door/Lock6
Pest Infestation5

Top 311 Complaints

Noise - Residential197
HEAT/HOT WATER26
PAINT/PLASTER18
PLUMBING14
WATER LEAK13
Class C - Immediately HazardousNOV SENT OUT

§ 27-2005 ADM CODE FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING MISSING,1ST STABILIZING BAR FROM NORTH AT WEST AT TOP RAIL (SECURE BY USING APPROPRIATE NUTS AND BOLTS) AT WEST EXTERIOR WALL, 3RD STORY

Mar 29, 2026
Class C - Immediately HazardousNOV SENT OUT

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CASCADING WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2E

Mar 23, 2026
Class C - Immediately HazardousNOV SENT OUT

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2E

Mar 23, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2E

Mar 23, 2026
Class B - HazardousNOV SENT OUT

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2B LOWER LEVEL, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2B

Mar 11, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2B LOWER LEVEL, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2B

Mar 11, 2026
Class B - HazardousNOV SENT OUT

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL, NORTH WALL AND AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2B

Sep 25, 2025
Class B - HazardousDEFECT LETTER ISSUED

§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ FT AT EAST WALL, SOUTH WALL, WEST WALL, NORTH WALL AND AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2B

Sep 25, 2025
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM EAST, THE 2nd BATHROOM FROM EAST, THE 2nd PRIVATE HALLWAY FROM NORTH, THE FOYER , THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2B

Sep 25, 2025
Class A - Non-HazardousVIOLATION DISMISSED

§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT EAST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 2B

Sep 25, 2025
110 of 62
page 1 / 7
Advertisement