7 total
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AT ADJACENT PROPERTY DURING BLDG ALTERATION, FILED SEP. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
NEW INSTALL OF WATER BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
PIPING ASSOCIATED WITH NEW BOILER EQUIPMENT FILED IN CONJUCTION WITH DOB NOW APPLICATION #X00709255.
REPLACEMENT OF BOILER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INT.RENOVATION OF EXISTING.BLDG, NEW FINISHES, REPLACEMENT OF WINDOWS AND DOORS.KITCHEN FIXTURES & BATH FIXTURES IN EXIST.LOCATION.NO CHANGE TO USE, EGRESS, OR OCC.UNDER THIS APPLICATION. ALL UNITS TO REMAIN OCCUPIED DURING CONST.
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.