6 total
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
Installation of outriggers and hoists for facade repair and inspection
Facade repairs including brick replacement, pointing, lintel replacement, parapet replacement as per plans; no change to use, egress, or occupancy.
DISH WIRELESS- Installation of 3 new antenna sectors with 6 RRH units and 1 GPS unit on roof. Install 1 wall mounted cabinet on roof. Related service connection on grade to roof.. All in conformance with TPPN 5/98.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR NEW BUILDING AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE
CONSTRUCTION EQUIPMENT - SCAFFOLD PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.