Back to building

533 EAST 139 STREET— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster53
Door/Lock31
Pest Infestation27
Smoke/CO Detector24
Water Leak21

Top 311 Complaints

PAINT/PLASTER39
WATER LEAK33
UNSANITARY CONDITION30
HEAT/HOT WATER29
PLUMBING23
Class A - Non-HazardousNOV SENT OUT

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 4B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 4B

Apr 6, 2026
Class B - HazardousNOTICE OF ISSUANCE SENT TO TENANT

§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MORE THAN 10 SQ. FT AT NORTH AND WEST WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 4B

Apr 6, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 4B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 4B

Apr 6, 2026
Class A - Non-HazardousNOV SENT OUT

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE FOYER LOCATED AT APT 4B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 4B

Apr 6, 2026
Class A - Non-HazardousNOV SENT OUT

§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 4B

Apr 6, 2026
Class B - HazardousNOV SENT OUT

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4B, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH

Apt: 4B

Apr 6, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LATCH AND ITS ASSEMBLY AT ROOF DOOR. AT 1st PUBLIC HALL BULKHEAD FROM EAST, 5th STORY

Mar 23, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 1A

Mar 23, 2026
Class B - HazardousNOV SENT OUT

§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 1A

Mar 23, 2026
Class B - HazardousNOV SENT OUT

§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL AND EAST WALL IN THE BATHROOM LOCATED AT APT 1A, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Apt: 1A

Mar 23, 2026
110 of 247
page 1 / 25
Advertisement