426 EAST 162 STREET— Violations & Issues
Top Violations
Top 311 Complaints
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 1A
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND LOCK ASSEMBLY AT BUILDING ENTRANCE DOOR , 1st STORY
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT BUILDING ENTRANCE DOOR , 1st STORY
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 1A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING AND ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 1A
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 1A
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Apt: 1A
566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF EXCESSIVE BUMBLE BEES AT PUBLIC HALL, 1st STORY
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BULKHEAD DOOR LOCATED AT PUBLIC PARTS