8 total
INSTALLATION OF LIGHT DUTY SIDE WALK SHED.AS PER PLAN.
Ceiling repairs: remediation of fire-related limited interior and exterior damages
Installation of temporary wall bracings (8 units) at 6th floor and roof
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Roof Repair Project
INSTALLTION OF LIGHT DUTY SIDE WALK SHED AT FRONT AS PER PLAN
Installation of temporary partitions and a roof barricade. No change to use occupancy or egress.
INSTALLATION OF LIGHT DUTY SIDE WALK SHED.AS PER PLAN.