290 EAST 150 STREET— Violations & Issues
Top Violations
Top 311 Complaints
§ 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE SINK IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE WASHBASIN IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT THE NORTH WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE CEILING, APPROX 18 SQ FT IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 1
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT THE SOUTH WALL, APPROX 15 SQ FT IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Apt: 1