7 total
INSTALLATION OF TEMPORARY PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE,EGRESS ,OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE ROOF PROTECTION IS AT THE FRONT BUILDING ROOF FOR THE MECHANICAL UNIT.
INSTALLATION OF HEAVY-DUTY SIDEWALK SHED/OVERHEAD PROTECTION AS PER PLANS. THE SWS/OVH IS TO BE INSTALLED ON THE ROADWAY AND SHALL BE PERMITTED AT DOT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. DOT PERMIT FILED SEPARATELY BY OTHERS.
INSTALLATION OF BARRICADE AS PER PLAN. THE BARRICADE TO BE INSTALLED ON THE ROADWAY AND SHALL BE PERMITTED AT D.O.T NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMIT FILED SEPARATELY BY OTHERS.
Installation of new ADA ramp and concrete steps as per plans filed herewith. No change to use, egress or occupancy
Construction fence filed to enclose the area of proposed construction located at the subject address.
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF