9 total
REPLACE BOILER BREECHING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Misc Facade Repairs including concrete repairs at balconies, replacement of bricks, shelf angles, lintels, windowsills, and mortar joint repointing.
Misc Facade Repairs including concrete repairs at balconies, replacement of bricks, shelf angles, lintels, windowsills, and mortar joint repointing.
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Andres Silva
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Rihard Jager.
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.