10 total
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of 13.08 kw solar energy system on roof. No change of occupancy, use or egress.
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210180873
PROPOSE PLUMBING AND SPRINKLER SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 # 210180873
PROPOSE TO INSTALL TWO NEW GAS FIRED BOILERS AS PER PLAN IN CONJUNCTION WITH ALT 1 # 210180873.
PROPOSE MECHANICAL SCOPE OF WORK FILED IN CONJUNCTION WITH ALT 1 #210180873
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
PROPOSE STRUCTURAL SCOPE OF WORK FOR THE RENOVATION BY REPLACING THE FLOORS AND ROOF AND REPAIRS TO THE EXISTING MASONRY BEARING WALL FILED IN CONJUNCTION WITH ALT 1 # 210180873.
INSTALL CONSTRUCTION DEBRIS CHUTE IN FLOOR OPENING AS PER PLAN
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.