3 total
FACADE RESTORATION INCLUDING REMOVAL OF STUCCO, BRICK REPLACEMENT, LINTEL REPLACEMENT,SILL REPLACEMENT, POINTING, AND APPLICATION OF CONSOLIDATION TREATMENT.NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALL 7 FEET OF GAS PIPING CONNECTED TO EXISTING GAS PIPING FOR REPLACEMENT GAS BOILER. INSTALL NEW INDIRECT HOT WATER HEATER. BOILER WORK TYPE FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK- SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014CODE