Back to building

1219 WARD AVENUE— Violations & Issues

Loading chart data...

Top Violations

Paint/Plaster15
Flooring3
Door/Lock2
Water Leak2
Pest Infestation1

Top 311 Complaints

UNSANITARY CONDITION8
PAINT/PLASTER7
PLUMBING3
FLOORING/STAIRS3
Noise - Residential2
Class A - Non-HazardousNOV SENT OUT

§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET DOORS AT EAST WALL IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Dec 4, 2023
Class A - Non-HazardousNOV SENT OUT

§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Dec 4, 2023
Class A - Non-HazardousNOV SENT OUT

§ 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE BASIN AT EAST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Dec 4, 2023
Class A - Non-HazardousNOV SENT OUT

§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Dec 4, 2023
Class A - Non-HazardousNOV SENT OUT

§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CLOSET DOOR AT EAST WALL IN THE 6th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Dec 4, 2023
Class C - Immediately HazardousNOV SENT OUT

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 2nd WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 6th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Mar 21, 2022
Class C - Immediately HazardousNOV SENT OUT

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 6th ROOM FROM EAST AT SOUTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Mar 21, 2022
Class C - Immediately HazardousNOV SENT OUT

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Mar 21, 2022
Class C - Immediately HazardousNOV SENT OUT

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Mar 21, 2022
Class C - Immediately HazardousNOV SENT OUT

§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST

Apt: 2

Mar 21, 2022
1–10 of 29
page 1 / 3
Advertisement