6 total
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
REPLACE CRACKED/LOOSE BRICKS AND RE-POINT MORTAR AS SHOWN ON PLANS. NO CHANGES TO USES, EGRESS OR OCCUPANCY. SIDEWALK SHED BY OTHERS.
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.
AT&T -Relocation of existing telecommunication antenna sectors and existing antennas with installation of new RRH units on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
AT&T - Replacement of existing telecommunication antennas with installation/replacement of RRH units on roof. Retrofit of existing cabinets in existing equipment room on 1st floor. Relocation of ballast frames with related equipment on the roof. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.