3 total
UNIT 3E; KITCHEN AND 2 BATH REMODEL; REPLACING CABINETS, COUNTERTOPS, HOT WATER TANK, REPLACE PLUMBING FIXTURES, PLUMBING LINES -REDO ROUGH PLUMBING WASTE,WATER AND VENT LINES, VERIFY P-TRAP; REPLACE FLOORING IN ENTIRE UNIT. SUBJECT TO FIELD INSPECTION
REPAIRS TO EXISTING ELECTRICAL WORK. INCLUDES NEW LIGHTS AND DEVICES ON EXISTING CIRCUITS.
TUCKPOINT AS NEC. CAULK AS NECESSARY, WATERPROOF BLOCK.- (NO STRUCTURAL WORK)- ALL WORK SAME AS EXISTING; SUBJECT TO FIELD INSPECTIONS