7 total
SELF-CERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING RESIDENTIAL CONDO UNIT 8E. SCOPE TO ALSO INCLUDE ASSOCIATED MEP WORK. NO CHANGE TO EXISTING USE. (OCCUPANCY R2 / CONSTRUCTION TYPE IV)
WINDOWS (REPLACEMENT ONLY): QTY 6
HOT WATER HEATER (REPLACEMENT ONLY): QTY 1
*SPR 2019 CBRC* EXTERIOR 1-STORY ADDITION TO ADD A THREE SEASONS ROOM TO THE THE ROOFTOP DECK THAT CONNECTS TO UNIT 8-B ON AN EXISTING 8-STORY MULTI-RESIDENTIAL CONDO BUILDING AS PER PLANS. (OCCUPANCY TYPE: R-2; CONSTRUCTION TYPE: 1B) **CERTIFIED PLANS CORRECTIONS: CONDITIONAL PERMIT SUBJECT TO FIELD INSPECTIONS **
SELF CERT 2019- THE CURRENT USE/OCCUPANCY CLASSIFICATION IS RESIDENTIAL CONDOMINIUM/A2 THE PROPOSED USE/OCCUPANCY CLASSIFICATION IS RESIDENTIAL CONDOMINIUM/A2. THE PROPOSED WORK IS FOR THE INTERIOR ALTERATIONS OF AN EXISTING CONDOMINIUM INCLUDING PLUMBING, ELECTRICAL AND MECHANICAL WORK.
ERECT FOUR(4) SCAFFOLDS FROM 07/06/2020 TO 07/06/2021.
TUCKPOINT 10,200SQFT, BRICK REBUILD 2890SQFT, SHELF ANGLE REPLACEMENT 518LF, SEALANT REPLACEMENT 4560LF, LIMESTONE REPLACE 25LF.