CONCRETE MASONRY REPAIR / REPLACEMNT: 100SQ. FT., EXCAVATION = NO. LOCATION: FLOORS 8-11 (MISC. CONCRETE REPAIRS).
TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 244 FT., MAX. HEIGHT: 120 FT. LOCATION: NORTH ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE THIS PERMIT IS NOT VALID WITHOUT CORRESPONDING CDOT PUBLIC WAY PERMIT.
GENERAL MAINTENANCE FEBRUARY 2024
REPLACE HOIST ROPES ON THREE (3) 2500LB.CAP, 11-FLOORS, 350 FPM, GEARED TRACTION PASENGER ELEVATORS #1, #2, & #3. PURSUANT TO THE SCOPE OF WORK SUBMITTED. EV001946
GENERAL MAINTENANCE JANUARY 2024
GENERAL MAINTENANCE DECEMBER 2023
GENERAL MAINTENANCE NOVEMBER 2023
GENERAL MAINTENANCE SEPTEMBER 2023
GENERAL MAINTENANCE SEPTEMBER 2023
ERECT ONE (1) SCAFFOLD DATES 07/24/2023 THROUGH 07/24/2024
PARKING STRUCTURE MAINTENANCE: 395 SQFT PARTIAL DEPTH REPAIRS, ROUT AND SEAL 1000 L FT, JOINT SEALANT REPLACEMENT 1205 L FT, REPLACE 91,500 SQ FT TRAFFIC TOPPING, 45 SQ FT CONCRETE FACADE REPAIR
INSTALLATION OF CAMARA AND ADDITIONAL TRAVELING CABLES ON THREE(3) 2500LB CAPACITY, 350FPM, 11-FLOOR, PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK ON JOBSITE AT TIME OF INSPECTION.(EV001946)
GENERAL BUILDING MAINTENANCE FOR SEPTEMBER 2022
GENERAL BUILDING MAINTENANCE AUGUST ,2022
GENERAL BUILDING MAINTENANCE FOR OCTOBER, 2022
GENERAL MAINTENANCE FOR JUNE, 2022
GENERAL MAINTENANCE DECEMBER 2022
GENERAL MAINTENANCE NOVEMBER 2022
GENERAL MAINTENANCE FEBRUARY 2023
GENERAL MAINTENANCE DECEMBER 2022