13 total
REMOVE AND REPLACE 600 FAN COIL UNITS AND ASSOCIATED PIPING. FINAL PHASE
INSTALL LED ILLUMINATED CHANNEL LETTER ON NORTH ELEVATION CANOPY.
INSTALL LED ILLUMINATED CHANNEL LETTER ON EAST ELEVATION CANOPY.
INSTALL LED ILLUMINATED CHANNEL LETTER SET ON NORTH EAST CORNER OF BUILDING WALL.
REPLACE EXTERIOR LIGHT WITH LED STRIP
REMOVE AND REPLACE 602 FAN COIL UNITS AND ASSOCIATED PIPING. (PHASE 3)
CONCRETE REPAIRS TO THE POOL WALL REPAIRS (20SF) TOPSIDE (50 SF) OVERHEAD (100 SF).
REPLACE DOMESTIC WATER VALVES & ASSOCCIATED PIPING IN HIGH ZONE A,HIGH & LOW ZONE B IN EXISTING RESIDENTIAL BUILDING.
FIRE ALARM - TENANT BUILD OUT ON 1ST FL (P). CK#7304826;$600.00.
MODERNIZATION OF ONE(1) 3000LB CAPACITY, 25FPM, 2-FLOOR, SIDEWALK FREIGHT ELEVATOR, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV005114)
LIFE SAFETY IMPROVEMENT RELATED SECURITY WORK ON BASEMENT, FLOOR 1, 2 & 3, WITH FA RELEASE.
MODERNIZATION OF ELEVATORS: A TOWER A3,A4,A5 PASSENGER GROUP-700FPM,2000LB CAPACITY,45 STOPS; B TOWER B3,B4,B5 PASSENGER GROUP-700FPM, 2000LB CAPACITY, 45 STOPS; A TOWER A1,A2 DUPLEX AUTO- 350FPM, 3500LB CAPACITY, 45 STOPS; B TOWER B1,B2 DUPLEX AUTO- 350FPM, 3500LB CAPACITY, 45 STOPS, PURSUANT TO THE SCIOPE OF WORK SUBMITTED.(EV005114)
REPLACE 602 FAN COIL UNITS AND ASSOCIATED PIPING.