134 total · Page 1 of 7
FIRE ALARM: REPAIR EXISTING SYSTEM. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: CITY FIRE ALARM BOX CONNECTION . SPECIFIC LOCATION: !ST FLOOR, 10TH FLOOR.
FIRE ALARM: REPAIR EXISTING SYSTEM. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: CITY FIRE ALARM BOX CONNECTION . SPECIFIC LOCATION: !ST FLOOR, 10TH FLOOR.
REMOVAL OF ONE(1) 6000LB CAPACITY, 2-FLOOR, 350FPM, PASSENGER ELEVATOR(KITCHEN), DUE TO KITCHEN BEING CONVERTED INTO BED SPACE, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(100043936)
REMOVAL OF ONE(1) 6000LB CAPACITY, 2-FLOOR, 350FPM, PASSENGER ELEVATOR(KITCHEN), DUE TO KITCHEN BEING CONVERTED INTO BED SPACE, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(100043936)
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: INSTITUTIONAL. START DATE: 11/21/2025. END DATE: 5/20/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:B200417081. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: CITY FIRE ALARM BOX CONNECTION . SPECIFIC LOCATION: 1ST FLOOR RETAIL AREA.
REPLACEMENT OF HOIST CABLES ON TWO(2) 3500LB CAPACITY, 17-FLOOR, 500FPM, PASSENGER ELEVATORS(#20-#21), PURSUANT T OTHE SCOPE OF WORK SUBMITTED.(100043953)
FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:B200411189. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: CITY FIRE ALARM BOX CONNECTION . SPECIFIC LOCATION: 4TH FLOOR NEEDLE LOC ROOM.
**FIRE ALARM PERMIT**PARTIAL BUILD OUT OF 4TH FLOOR ADDED NEW CONTROL RELAYS FOR SECURITY INTERFACE TO THE EXISTING FIRE AND VOICE EVACUATION SYSTEM.
MAINTENANCE FOR SEPTEMBER 2024
MAINTENANCE FOR AUGUST 2024
MAINTENANCE FOR JULY 2024
MAINTENANCE FOR MAY 2024
MAINTENANCE FOR JUNE 2024
INSTALLATION OF NEW DOOR OPERATORS ON FOUR(4) 6000LB CAPACITY, 18-FLOOR, 800FPM(#1-4); ONE(1) 7000LB CAPACITY, 19-FLOOR, 350FPM(#5); AND ONE(1) 7000LB CAPACITY, 18-FLOOR, 500FPM(#6), PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(100043953) 6 TOTAL ELEVATORS
MAINTENANCE FOR APRIL 2024
MAINTENANCE FOR MARCH 2024
MAINTENANCE FOR FEBRUARY 2024
REPLACE HOIST ROPES ON FOUR (4) GEARLESS TRACTION 500 FPM PASSENGER ELEVATORS. #8, #9, 
 5000LB.CAP, 17-FLOORS, 18-STOPS. #18 3500LB.CAP, 17-FLOORS, 16-OPENINGS. PURSUANT TO THE SCOPE OF WORK SUBMITTED. 100043953
MAINTENANCE FOR DECEMBER 2023