9 total
MODERNIZATION OF ONE(1) 4000LB CAPACITY, 2-FLOOR, HYDRAULIC, PASSENGER ELEVATOR, PURSUANT TO THE SCOPE OF WORK SUBMITTED.(100601431)
FIRST SURFACE FULL COLOR VINYL READING "HUNTINGTON"
FIRST SURFACE FULL COLOR VINYL READING "HUNTINGTON"
INTERIOR WORK ON EXISTING BANKING AREA. NO CHANGE IN USE. USING EXISTING CIRCUITS. JOB# 432-000
CCTV SYSTEM/LOW VOLTAGE SYSTEMS
INSTALLATION OF (1) SET OF INTERNALLY ILLUMINATED CHANNEL LETTERS TO BE MOUNTED TO THE NORTH BUILDING ELEVATION. SIGN TO READ (LOGO) DRIVE UP AND GO.
NEW POD FOR WALK UP AND GO LOCATED IN THE PARKING LOT AND ASSOCIATED ITEMS AT EXISTING JEWEL-OSCO STORE.
LED RETROFIT OF JEWEL STORE
INSTALL POWER FOR 2 CAR CHARGING STATIONS.