5 total
VERIFY ROUGH-IN/INSTALLATION OF ALL ELECTRICAL DEVICES -PULL EQUIPMENT GROUND THROUGH ALL RACEWAYS, TERMINATE AT ELECTRICAL PANEL -INSTALL EQUIPMENT GROUND PIGTAIL TO ALL BOXES -REMOVE ALL ELECTRICAL DEVICES FOR INSPECTION
REPAIR EAST ELEVATION EXTERIOR STAIR TO BASEMENT AND GRADE TO 1ST FLR.
REMOVE REPLACE PIPING AND PLUMBING FIXTURES IN KI, REPLACE VANITIES AND KITCHEN SINK
-INSTALL NEW SERVICE RISER -INSTALL NEW METER SOCKET -INSTALL NEW 100A PANEL
CABINETS. COUNTERTOPS. FLOORING (WOOD/TILE). TILE.PAINT.REPLACE DRYWALL, DOORS & WINDOWS- SAME AS EXISTING. ELECTRICAL MUST BE PULLED UNDER SEPARATE PERMIT. ERECT 6 FT HIGH WOOD FENCE AT REAR OF LOT (30 LF)