3 total
SPR 2019 CBRC: ALTERATION OF AN EXISTING MERCANTILE OCCUPANCY TO CONVERT 3 EXISTING TENANT SPACES INTO A SINGLE TENANT SPACE. REMOVAL OF EXISTING SEPARATION WALLS BETWEEN THE 3 SPACES. REMOVE EXISTING EXTERIOR SECURITY GATE AND REPLACE WITH NEW SECURITY GATE WITH PANIC BAR AND CLOSER. REMOVE EXISTING COMBUSTIBLE CONSTRUCTION ENCLOSURE AROUND FURNACE AND REPLACE WITH NEW NON-COMBUSTIBLE 1-HOUR FIRE-RATED ENCLOSURE WITH NEW 1-HOUR FIRE-RATED DOOR AND FRAME AND LOCKING HARDWARE. NEW WORK SHALL CONS
ROOF RECOVER ONLY - NO STRUCTURAL WORK...INSTALL AND REPLACE HOT AND COLD WATER PIPING FROM 1/2 TO 3/4...ALL WATER DISTRIBUTING PIPING INSIDE COMMERCIAL UNIT 1 ST FLOOR ONLY
CORRECT ELECTRICAL VIOLATIONS, REMOVE ALL EXPOSED WIRES,INSTALL EM AND EXIT LIGHT FIXTURES, REPLACE EXTERIOR METER, INSTALL 2X4 LIGHT FIXTURES AND REPLACE DAMAGED 100 AMP PANEL.