168 total · Page 1 of 9
DIRECT DEVELOPER SERVICES 2019 CBC. CAISSONS, FOUNDATION, EARTH RETENTION SYSTEM, PLUMBING AND ASSOCIATED BELOW GRADE CONSTRUCTION ONLY FOR A MIXED-USE COMMERCIAL 3 STORY BUILDING ADDITION TO UNITED CENTER AND WILL INCLUDE PARKING, STORAGE, COMMERCIAL LOADING AND RETAIL. BUILDING WILL HAVE AN OCCUPIED ROOF. THIS PROJECT IS A HIGH-RISE. OCCUPANCY GROUPS A-2, A-3, A-4, B, S-1, AND S-2. TYPE 1-A CONSTRUCTION.CONSULTANT REVIEWER: V3 COMPANIES OF IL
DIRECT DEVELOPER SERVICES 2019 CBC. CAISSONS, FOUNDATION, EARTH RETENTION SYSTEM, PLUMBING AND ASSOCIATED BELOW GRADE CONSTRUCTION ONLY FOR A MIXED-USE COMMERCIAL 3 STORY BUILDING ADDITION TO UNITED CENTER AND WILL INCLUDE PARKING, STORAGE, COMMERCIAL LOADING AND RETAIL. BUILDING WILL HAVE AN OCCUPIED ROOF. THIS PROJECT IS A HIGH-RISE. OCCUPANCY GROUPS A-2, A-3, A-4, B, S-1, AND S-2. TYPE 1-A CONSTRUCTION.CONSULTANT REVIEWER: V3 COMPANIES OF IL
PERMIT EXPIRES ON 02/17/2026 ERECTION STARTS: 12/18/2025, ERECTION ENDS: 4/1/2025. UNITED CENTERTENT- SELF-CERT, 105 DAY EVENT (12/18/2025-4/1/2026) ERECT ONE (1) 16.4X50 (5MX15M) STRUCTURE TENT SETUP 12/18/2025- REMOVE 4/1/2026 ASSEMBLY
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 10/23/2025. END DATE: 10/23/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST.
LINE VOLTAGE ELECTRICAL WORK. INSTALL TEMPORARY 70 KW DIESEL GENERATOR. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: LOT K.
PERMIT EXPIRES ON 10/06/2025 ERECTION STARTS: 8/20/2025, ERECTION ENDS: 8/25/2025. BULLS FEST 3X3 TOURNAMENTCANOPY- 2 DAY EVENT (AUGUST 23, 2025 - AUGUST 24, 2025)ERECT FOUR (4) CANOPIES, ONE (1) 10X50 FRAME, ONE (1) 10X100 FRAME, ONE (10 20X30 FRAME, ONE (1) 30X50 (9MX15M) STRUCTURESETUP 8/20/2025- REMOVE 8/25/2025ASSEMBLY
LINE VOLTAGE ELECTRICAL WORK. INSTALL TEMPORARY 600 KW DIESEL GENERATOR. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: WEST END OF BUILDING IN PARKING LOT G NORTH.
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL OTHER. SPECIFIC LOCATION: UNITED CENTER PARKING LOT FOR WINDY CITY SMOKEOUT.
PERMIT EXPIRES ON 09/07/2025 ERECTION STARTS: 7/3/2025, ERECTION ENDS: 7/18/2025. WINDY CITY SMOKE OUT 2025- DOUBLE DECKER PLATFORM_STRUCTURE- SELF-CERT, 4 DAY EVENT (JULY 10, 2025 - JULY 13, 2025)ERECT ONE (1) DOUBLE DECKER STRUCTURE; 206.5X58 RING LOCK PLATFORM FOOT PRINT 9200SF, LEVEL 1, 33X148 (10MX45M) MEZZANINE DECK WITH 33X148 (10MX45M) STRUCTURE CANOPY, ONE (1) 20X40 (6MX12M) STRUCTURE TENT.SETUP 7/3/2025- REMOVE 7/18/2025ASSEMBLY
LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: PARKING LOT.
PERMIT EXPIRES ON 09/01/2025 ERECTION STARTS: 7/3/2025, ERECTION ENDS: 7/18/2025. ERECTION STARTS: 7/3/2025, ERECTION ENDS: 7/18/2025. WINDY CITY SMOKE OUT 2025- SMALL TENTS ADDEDTENT- SELF-CERT, 4 DAY EVENT (JULY 10, 2025 - JULY 13, 2025)ERECT TWO (2) TENTS GANGED, ONE (1) 20X20 FRAME, AND ONE (1) 30X30 FRAME.SETUP 7/3/2025- REMOVE 7/18/2025ASSEMBLY
PERMIT EXPIRES ON 09/01/2025 ERECTION STARTS: 7/7/2025, ERECTION ENDS: 7/17/2025. ERECTION STARTS: 7/7/2025, ERECTION ENDS: 7/17/2025. SELF CERT. CBC2019. 2025 WINDY CITY SMOKEOUT PLATFORMS, SCAFFOLDS AND TRUSSES AT UNITED CENTER. SIX STRUCTURES TOTAL: 1-16X16 DELAY TOWER SCAFFOLD, 1-76X32 FOH VIP PLATFORM, 1-96X12 AND 1-80X12 RAISED CABANA PLATFORMS, 1-43FT WIDE ENTRY TRUSS AND 1-46FT GOALPOST VIDEO TRUSS. TECHNOTRIX WITH DUFF ENTERTAINMENT.
PERMIT EXPIRES ON 08/27/2025 ERECTION STARTS: 7/3/2025, ERECTION ENDS: 7/18/2025. WINDY CITY SMOKE OUT 2025- LARGE TENT TENT- SELF-CERT, 4 DAY EVENT (JULY 10, 2025 - JULY 13, 2025)ERECT ONE (1) 40X180 STRUCTURE TENTSETUP 7/3/2025- REMOVE 7/18/2025ASSEMBLY
PERMIT EXPIRES ON 08/26/2025 ERECTION STARTS: 7/3/2025, ERECTION ENDS: 7/18/2025. WINDY CITY SMOKE OUT 2025- SMALL TENTTENT- SELF-CERT, 4 DAY EVENT (JULY 10, 2025 - JULY 13, 2025)ERECT TWENTY-TWO (22) TENT STRUCTURES, THREE (3) 10X20 FRAME, ONE (1) 10X30 FRAME, TWO (2) 10X50 FRAME, ONE (10 10X60 FRAME, ONE (1) 10X90 FRAME, ONE (1) 10X180 FRAME, ONE (1) 10X250 FRAME, TWO (2) 20X20 FRAME, ONE (1) 20X30 FRAME, FIVE (5) 20X40 FRAME, TWO (2) 30X20 STRUCTURE, ONE (1) 30X60 STRUCTURE, ONE (1) 40X30 S
PERMIT EXPIRES ON 08/18/2025 ERECTION STARTS: 7/7/2025, ERECTION ENDS: 7/15/2025. SELF CERT. CBC 2019. REINSTATEMENT OF 2024 PERMIT 101053755 FOR THE SAME 1- SAM 575 40X50 MOBILE STAGE WITH MULTIPLE WINGS AND LOADING DOCKS FOR THE 2025 WINDY CITY SMOKEOUT EVENT AT UNITED CENTER- NORTH PARKING LOT ON JULY 10-13 2025. CREATIVE AUDIO WITH DUFF ENTERTAINMENT.
FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101068149. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: LOWER LEVEL SUITES - SUITE L30.
FIRE ALARM: MODIFICATION OF EXISTING SYSTEM. ASSOCIATED BUILDING PERMIT:101066534. AFFECTS: 0 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: PENTHOUSE LEVEL.
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. SPECIFIC LOCATION: ARENA.
DDS 2019 CBRC. RENOVATION OF THE EXISTING PENTHOUSE LEVEL AT THE UNITED CENTER. PROPOSED IMPROVEMENT WORK ENTAILS NEW NON-BEARING PARTITIONS, MILLWORK, CEILING SYSTEM WITH NEW LIGHTING, POWER AND COMMUNICATION, FIXTURES AND FURNITURE SYSTEMS, FLOOR AND WALL FINISHES, MECHANICAL AND PLUMBING. CONSTRUCTION TYPE IA. CONSULTANT REVIEWER: V3 COMPANIES OF IL
SELF-CERT 2019 CBRC: INTERIOR RENOVATION TO OWNER SUITE L30 ON THE 2ND FLOOR OF EXISTING ARENA TO INCLUDE MECHANICAL, ELECTRICAL AND PLUMBING. CONSTRUCTION TYPE IA.