TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 2000 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: WORK ON ALL ELEVATIONS.
TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 40 FT., MAX. HEIGHT: 110 FT. LOCATION: ALL ELEVATIONS OF THE BUILDING. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MASONARY REPAIRS, STONE REPAIRS, REPAIR LINTELS, TUCKPOINTING (3000 SQFT) NO STRUCTUAL WORK.
ERECT ONE (1) SCAFFOLD DATES 07/29/2022 THROUGH 07/29/2023
TUCKPOINTING 4000 SQ FT, BRICK REPLACEMENT, CONCRETE REPAIRS AND SHELF ANGLE REPAIRS UNDER 6' - NO STRUCTURAL WORK - SEPARATE ENVIRONMENTAL PERMIT FOR GRINDING
ERECT ONE (1) SCAFFOLD DATES 03/11/2022 THROUGH 03/11/2023
OWNER OR LICENSED CONTRACTOR
REPAIR
EAST ELEVATION TUCKPOINTING - NO STRUCTURAL WORK - 4000 SQFT; PARPAET WALL REPAIR, SHELF ANGLE REPAIRS, CAULKING AS NEEDED, ISOLATED BRICK REPLACEMENT AND CONCRETE REPAIRS (SEPARATE ENVIRONMENTAL PERMIT REQ'D FOR GRINDING)
ERECT 2 SCAFFOLDS 04/21/2020 TO 04/21/2021
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
No details available
No details available
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
SPECIAL SERVICE SWITCHBRD
SERVICE CAPACITY REQUIREMENTS
PLENUM WIRING METHODS
MINIMUM WORKINGSPACE
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
MAINTAIN OR REPAIR ELECT ELEVA
FIRE RESISTIVE SUPPORTS
ARRANGE FOR RE-INSPECTION
REMOVE
PLANS & PERMITS REQ - CONTRCTR
SEND EX. METAL LETTER